|Table of Contents|

Theoretical analysis on speeding up the highway construction with non stated-owned capital(PDF)

《长安大学学报(社科版)》[ISSN:1671-6248/CN:61-1391/C]

Issue:
2007年01期
Page:
1-5
Research Field:
专家论坛
Publishing date:
2007-03-20

Info

Title:
Theoretical analysis on speeding up the highway construction with non stated-owned capital
Author(s):
ZHOU Guo-guang
School of Economics and Management, Changan University, Xian 710064, Shaanxi, China
Keywords:
traffic and transportation engineering planning and managing of transportation highway development in China highway investment and financing system non stated-owned capital reform
PACS:
F540.3
DOI:
-
Abstract:
The highway construction in China calls for quicker development. As the quick development of highway net work and shortage of highway construction funds still exist, the reform on highway investment and financing system based on the tolling system needs to be deepened. The important thing now is to speed up the highway construction with non state- owned capital and the reform of the highway investment and financing system under the guideline of relative state policies.

References:

[1] 交通部.2001~ 2005年公路水路交通行业发展统计 公报[EB/OL].(2005-12-30)
[2006-12-25].http:// www.moc.gov,cn/news.20051230/200512300018. html.
[2] 交公路发
[2006]654号.关于进一步规范收费公路管 理工作的文件[S].
[3] 李盛霖.在2007年全国交通工作会议上的讲话[N]. 中国交通报,2006-12-30(A2/3).
[4] 孙启鹏,丁海鹰.公路基础设施民营化问题研究[J]. 综合运输,2004,25(10):21-25.
[5] 何 昌.交通部公路司副司长李华就进一步规范收费 公路管理答本报记者问[N].中国交通报,2006-12-20 (A1).
[6] 交通部.就《收费公路管理条例》答记者问[N].中国 交通报,2004-9-25(3).
[7] 周国光,俸 芳.从新都“绕城路”看我国道路收费政 策[J].中国公路,2006,23(6):47-51.
[8] 周国光.中国公路发展与投融资体制改革[J].交通财 会,2006,21(4):24-31.
[9] 周国光.中国路桥收费问题透视[J].长安大学学报: 社会科学版,2005,7(4):1-5.
[10] 李云峰.从“首发模式”失败看高速公路投资改革 [N].新京报,2004-09-23(1).

Memo

Memo:
-
Last Update: 2007-03-20