Fuzzy synthetic evaluation on variable weight of investment risk in road project(PDF)

《长安大学学报(社科版)》[ISSN:1671-6248/CN:61-1391/C]

Issue:
2006年02期
Page:
1-5
Research Field:
交通运输与管理
Publishing date:
2006-06-20

Info

Title:
Fuzzy synthetic evaluation on variable weight of investment risk in road project
Author(s):
SHI Yong-min ZHANG Zheng-ming XIAO Liang
School of Highway, Changan University, Xian 710064, Shaanxi, China
Keywords:
road construction investment risk fuzzy evaluation variable synthesis
PACS:
F540. 31
DOI:
-
Abstract:
There are lots of investment risks in road project,but the common method is to conduct qualitative and partial evaluation for the risks. On the principle of systematic evaluation, risk analysis system and risk index are set up, fuzzy consistent matrix is introduced to calculate basic weight, partial variable weight with the combination of penalty-incentive is put forward to calculate variable weight, and fuzzy-AHP method is adopted to analyze the investment risks in road project. The feasibility of the method is verified in the experiment and engineering.

References:

[1] 蒋先玲.项目融资[M].北京:中国金融出版社,2001.
[2] 张 星,孙建军,李 胜.BOT项目风险的模糊评价 [J].上海经济研究,2004,10(10):69-73.
[3] 李士勇.工程模糊数学及应用[M].哈尔滨:哈尔滨工 业大学出版社,2004.
[4] 姚 敏,张 森.模糊一致矩阵及其在决策中的分析中 的应用[J].系统工程理论及实践,1998,18(5):78-81.
[5] 张吉军.模糊一致矩阵三种排序方法的比较研究[J]. 系统工程与电子技术,2003,25(11):1370-1372.
[6] 陈引社.提高道路运输市场集中度设想[J].长安大学 学报:社会科学版,2003,5(3):17-21.
[7] 段树乔.电力企业安全管理变权综合评价方法[J].数 学实践与认识,2003,33(8):17-22.

Memo

Memo:
-
Last Update: 2006-06-20