|Table of Contents|

Comprehensive Evaluation System for Completed Construction Projects(PDF)

《长安大学学报(社科版)》[ISSN:1671-6248/CN:61-1391/C]

Issue:
2006年01期
Page:
19-23
Research Field:
交通运输与管理
Publishing date:
2006-03-20

Info

Title:
Comprehensive Evaluation System for Completed Construction Projects
Author(s):
GUO Han-ding1 2 WANG Kai1
1. Department of Management Engineering, Tianjin Institute of Urban Construction, Tianjin 300384, China; 2. School of Management, Tianjin University, Tianjin 300072, China
Keywords:
industrial and commercial management enterprise management construction quality process of quality supervision rating system completed projects
PACS:
F282
DOI:
-
Abstract:
In order to analyze the comprehensive evaluation system for completed construction projects, this paper first expounds its purposes. Based on the analysis of the factors influencing construction quality,it poses comprehensive rating ideas for completed projects from construction product quality, substance quality, and supervision process quality. It finally builds comprehensive rating system for completed projects by three levels on the basis of design quality, construction quality, material and equipment quality, action quality of bodies, and site substance quality. And two-step and two-time fuzzy comprehensive evaluation for completed projects is conducted.

References:

[1] 郭汉丁.建设工程质量政府监督管理研究[D].天津: 天津大学,2003.
[2] 郭汉丁.论建设工程质量政府阶段监督管理[J].长安 大学学报:建筑与环境工程版,2004,21(4):1-3.
[3] 郭汉刚,郭汉丁.浅谈竣工后建设工程质量政府监督管 理[J].山西建筑,2005,31(7):154-155.
[4] 郭汉丁,刘应宗.论施工前建设工程质量政府监督管理 [J].武汉理工大学学报:信息与管理工程版,2005,27 (1):243-246.
[5] 郭汉丁,刘应宗.地基基础工程质量的政府监督管理 [J].天津大学学报:社会科学版,2003,5(2):148-151.
[6] 郭汉丁,刘应宗.建设工程环境质量政府监督的探讨 [J].华中科技大学学报:城市科学版,2004,21(4):34- 38.
[7] 郭汉丁,刘应宗.建设工程环境质量及其问题特征分析 [J].重庆建筑大学学报:社会科学版,2004,27(1): 106-109.

Memo

Memo:
-
Last Update: 2006-03-20