Critical Factor Analysis for BOT Projects of Highway Construction(PDF)

《长安大学学报(社科版)》[ISSN:1671-6248/CN:61-1391/C]

Issue:
2002年02期
Page:
53-56
Research Field:
经济与管理
Publishing date:
2002-06-20

Info

Title:
Critical Factor Analysis for BOT Projects of Highway Construction
Author(s):
SHI Yong-minHU Hao
School of Highway, Chang′an University, Xi′an 710064, China)
Keywords:
highway constructionBOTinvestment return rateguarantee structure
PACS:
F540.31 
DOI:
-
Abstract:
According to investigation result of abroad BOT projects,and connecting reality of China,the critical factor for BOT projects of highway construction is analyzed as following: project identification、strength of consortium、project strength in finance、investment rate of return、guarantees structure and so on. The operation proposal about BOT project of highway construction in China is put forward.

References:

[1]  By Robert L K.Tiong,Member,ASCE.CSFs in Com- petitive Tendering and Negotiation Model for BOT Projects. Journal of Construction Engineering and management/September,1996: 205— 211.
[2] 种及灵.论BOT的核心法律问题[J].现代法学,2000, 22(2).
[3] 张极井.项目融资[M].北京:中信出版社,1997.
[4] 孙 黎,刘丰元.国际项目融资[M].北京:北京大学出 版社,1999.

Memo

Memo:
-
Last Update: 2002-06-20